Reebok Rl 10.0 Elliptical User Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
6
1.
A
ttach the Stabilizer (8) to the Frame (1) with
two M10 x 116mm Carriage Bolts (38) and two
M10 Locknuts (70).
2. While a second person hold the Upright (2) near
the Frame (1), connect the Upper Wire Harness
(77) to the Lower Wire Harness (78).
Tip: Avoid pinching the wires. Attach the
Upright (2) to the Frame (1) with four M10 x
25mm Patch Screws (48) and four M10 Split
Washers (85).
1
1
2
48
85
78
2
Avoid pinching
the wires
1
70
38
8
77
85
48
85
To make assembly easier, read the
i
nformation on page 5 before you begin.
Page view 5
1 2 3 4 5 6 7 ... 28

Comments to this Manuals

No comments